Phase 1 · Entry
Year 1–2
Acquisition, heritage stabilization, 1 MW hydro, marine gateway, spring water, FPIC.
CapEx $7.5–10.5M · revenue $1.5M/yr
Financial model
Marine gateway fees, eco-tourism, research, credits, power and heritage hospitality, in four phases. Every figure is an illustrative range, not a projection.
Tier 4: illustrative example. Ranges come from regional comparables and asset capacity data. No figure here is a financial projection.
Four phases
Phase 1 · Entry
Year 1–2
Acquisition, heritage stabilization, 1 MW hydro, marine gateway, spring water, FPIC.
CapEx $7.5–10.5M · revenue $1.5M/yr
Phase 2 · Build
Year 2–4
Eco-lodge, research station, residential, cultural centre, RCCS baseline.
CapEx $10–14M · revenue $7.85M/yr
Phase 3 · Expand
Year 4–7
50 MW hydro expansion, data centre, full RCCS.
CapEx $38–55M · revenue $16.35M/yr
Phase 4 · Scale
Year 7+
200 MW potential and an Indigenous economic partnership.
CapEx $120–160M · revenue $178M+/yr potential
Asset drivers, revenue streams, cost drivers, the RCCS credit model, the capital schedule and the long-term 200 MW site capacity, with the source tier of every figure.
Financial Model
Tier 4 — Illustrative Example. Ranges derived from regional comparables and asset-specific capacity data. No figures constitute financial projections. Source class: asset data (Tier 1–3) + regional comparable (Tier 3) + projection (Tier 4).
| Asset |
|---|
| HydroelectricTier 1 (license) / 3 (expansion)Licensed 1 MW, site capacity to 200 MW |
| Spring waterTier 1 (source) / 4 (revenue)Pristine mountain watershed, 1,600-acre reservoir, gravity-fed |
| Deep-water bayTier 1 (permit) / 3 (comps)28 acres tidal, Transport Canada international vessel permit |
| Heritage structuresTier 0 (listing) / 3 (comps)Cannery complex, heritage-listed, adaptive reuse potential |
| Fibre-opticTier 1 (infrastructure)Undersea cable to global backbone (Connected Coast, 2021) |
| Stream | Phase |
|---|---|
| Marine gateway fees | 1 |
| Eco-tourism | 1–2 |
| Research station | 2 |
| RCCS credit issuance | 2–3 |
| Renewable energy | 2 |
| Heritage hospitality | 2 |
| Residential | 3 |
| Acquisition | Property and development package |
| Heritage restoration | Structural stabilization of heritage-listed buildings |
| Infrastructure | Hydro recommissioning, marine facilities, fibre-optic distribution |
| Environmental | Spirit Bear habitat assessment, salmon stream restoration |
| Indigenous engagement | FPIC process, co-governance framework, benefit sharing |
| Permitting | Provincial and federal regulatory approvals |
| Credit Type | Est. Annual Value (Yr 5+) | |
|---|---|---|
| Blue carbonCoastal ecosystem carbon sequestration (kelp, eelgrass restoration) | $200–400K | |
| BiodiversitySpirit Bear population stability, salmon run health, marbled murrelet nesting | $150–300K | |
| Watershed healthButedale Lake–Falls–Bay corridor water quality and flow | $100–200K | |
| Human capitalHeritage knowledge preservation, Indigenous cultural programming, research output | $100–200K | |
| Total RCCS | $550K–1.1M |
| Phase | Amount (CAD) | Timeline | |
|---|---|---|---|
| AcquisitionProperty + development package | $2.5–3.5M | Year 0 | |
| Phase 1 — Heritage coreCannery stabilization, marine gateway, 1 MW hydro recommissioning, spring water bottling facility | $5–7M | Year 1–2 | |
| Phase 2 — Village buildResearch station, 20-room eco-lodge, 12-unit residential, cultural center | $10–14M | Year 2–4 | |
| Phase 3 — Hydro expansion50 MW turbine installation (existing dam/reservoir supports expansion) | $35–50M | Year 4–7 | |
| Phase 4 — Full operationsRCCS monitoring, data center buildout, fleet | $3–5M | Year 5–8 | |
| Total CapEx | $55.5–79.5M |
Tier 3 — Engineering assessment. The existing concrete dam on Butedale Lake (1,600 acres, 305 m head) was engineered for industrial-scale power in 1918. Modern run-of-river turbine technology on the same infrastructure can support phased expansion to 200 MW total site capacity.
| Expansion | Capacity |
|---|---|
| Phase 1 (existing)$740K/yr · Recommissioning only ($1–2M) | 1 MW |
| Phase 2$44.7M/yr at full output · $35–50M | 50 MW |
| Phase 3$178M/yr at full output · $120–160M | 200 MW |
At 200 MW, Butedale becomes a significant clean energy asset in British Columbia's grid — comparable to a mid-size BC Hydro facility. The 200 MW potential transforms the project's financial profile from eco-tourism with power to a power asset with eco-tourism. The spring water and hospitality become complementary revenue, not primary.
Acquisition, heritage stabilization, 1 MW hydro, marine gateway, spring water, FPIC
Eco-lodge, research station, residential, cultural center, RCCS baseline
50 MW hydro expansion, data center, full RCCS
200 MW potential, Indigenous economic partnership
Sources: Butedale Bay Property (Tier 3) · Faith Wilson listing (Tier 3) · Butedale Cannery heritage listing (Tier 0) · BC Hydro IPP rate (Tier 2) · Connected Coast (Tier 1) · Spirit Bear Lodge and Nimmo Bay operations — regional comparables (Tier 3).
Financial Model
All figures Tier 4 (Illustrative) — derived from regional comparables and stewardship_interventions patterns
Revenue Streams
HYDRO-POWER
HYDRO-POWER
SPRING-WATER
ECO-TOURISM-LODGE
MARINE-GATEWAY
HERITAGE-ADAPTIVE-REUSE
RESEARCH-STATION
RCCS-CREDIT
COMMUNITY-HOUSING
COMPUTE-HEAT-LOOP
Cost Structure